I am the EDF Energy Technical Lead on Main Control Room Training Simulators, and have replaced the MCR Training Simulators at 7 of our 8 nuclear power station sites in the UK.
I have also worked on the construction and commissioning of 5 new power stations in the UK - Ocker Hill Gas Turbine Station, and Nuclear Power Stations at Hartlepool (1979-1983), Heysham 2 (1983-1989), Sizewell B (1989-1995), Hinkley Point C (2019 - ), Bradwell B Generic Design Assessment.